ssn it technologies training and placement

SAP WM Essentials

Next Batch – TBD

Description:

Trainers Profile: SAP WM Training is delivered by a Real Time working SAP Consultant with more than 8 +Years of Real Time Experience in Multi National Companies. Having vast industrial Domain experience in manufacturing industry. More than 90% of our students got jobs in less than a month after completing their training.

Training Approach: The Course covers various industrial business processes and how to implement in SAP.

The Trainer Explains the Concepts from Basics.

Duration for SAP WM Training in SSN IT Technologies is 80 hours. Most other SAP WM Institutes in Bangalore Completes in just 60 Hours. This Proves the Extent and Depth of SAP WM Training @ SSN IT Technologies.

After ensuring that every trainee has well understood the concept, the trainer will move on to explaining how to apply the same concept to a real-time project.

The trainer will then discuss all the possible interview questions related to the concept in general as well as relating to a real time project.

1 Hour on every working day.

SAP WM Course Content

Introduction to Warehouse Management

  • Warehouse management overview in SAP R/3
  • Organization Data
  • Warehouse Structure

Organization Data / Define Warehouse Organization structure

  • Warehouse number
  • Storage type
  • Storage section
  • Storage Bin
  • Storage Bin Structure
  • Storage Bin Types
  • Picking Area
  • Storage unit
  • Quant etc…

Posting change notice

  • Number Range for PCN
  • Create Posting change Notice Manually
  • Convert PCN to TO

Transfer Order

  • Number Range for TO
  • Create Transfer Order Manually
  • Create TO w.r.t Transfer Requirement
  • Create TO w.r.t Posting change notice no
  • Create TO w.r.t Material document
  • Create TO w.r.t Inbound delivery with ASN – Advanced Shipping Notification
  • Confirm the Transfer Order
  • Cancel the Transfer Order
  • Delete TO
  • Automatic TO Creation and Confirmation

Put away Strategies

  • Next to empty bin
  • Pallet strategy
  • Fixed bin strategy

Picking Strategies

  • FIFO
  • Stringent FIFO
  • LIFO

Physical Inventory Processes in WM

  • Define the default values
  • Activating the physical inventory to storage type
  • Create Physical inventory record
  • Enter count results
  • Clear the difference in WM
  • Clear the difference in IM

Batch Management in WM

  • Condition Tables
  • Access Sequence
  • Strategy Types
  • WM Batch Search Procedure
  • Batch Status in WM
  • Characteristics and class
  • SLED In Batch in WM
  • Manual And Automatic Batch Display In WM

Dynamic Search Sequence

  • Storage type search
  • Storage section search
  • Storage bin type search

Forms of capacity check

  • Check based on maximum quantity per bin in storage type
  • Check according to maximum weight
  • Usage check based on material

Configuration with reference movement type and Immediate TO creation

  • Creation of special movement indicator and assigning with material master.
  • Assigning the destination storage type and storage bin for the movement type.

Hazardous Material

  • Create region code.
  • Assign region code to the Warehouse no.
  • Creation of Hazardous material
  • Assigning hazardous material no with normal material in material master
  • Activate hazardous material check
  • Allowed storage class for storage type

Posting the difference during the confirmation

  • Creation of difference indicator
  • Entering the difference indicator
  • Display the stock
  • Write off the difference at IM level.

Replenishment control

  • Maintaining maximum and minimum qty in material master.
  • Assigning the replenishment movement type for storage type.
  • Setting up Storage type search strategy for reserved storage type.

Two step picking

  • Activate two step picking for Material
  • Create group for outbound deliveries.
  • Picking TO creation
  • Allocation of TOs to Outbound deliveries.

Handling unit

  • Creation of packaging material
  • Assigning the packaging material group and packaging material type.
  • Packing the material with packaging material and repacking
  • Nest HU.

Storage unit management.;

  • Put-away with storage unit management
  • Picking with storage unit management.

Integration

  • WM with SD
  • WM with MM
  • WM with QM
  • WM with PP

Get Enroll Now

    Highly rated on Google

    4.9/5

    Course Duration

    8 weeks

    Learning Mode

    Offline

    Placement's*

    100%

    Book a Free Demo
    Book a Free Demo